Requirement 7.3.2
VVSG 1.0 Requirement 7.3.2: Vendors shall develop and document in detail the measures to be taken in a central counting environment. These measures shall include physical and procedural controls related to the handling of ballot boxes, preparing of ballots for counting, counting operations and reporting data.
Test Assertions
TA732-1: For a central counting environment the TDP SHALL detail all methods needed to ensure a secure environment.
TA732-2: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of physical controls related to the handling of ballot boxes.
TA732-3: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of physical controls related to the preparing of ballots for counting.
TA732-4: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of physical controls related to counting operations.
TA732-5: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of physical controls related to reporting data.
TA732-6: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of procedural controls related to the handling of ballot boxes.
TA732-7: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of procedural controls related to the preparing of ballots for counting.
TA732-8: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of procedural controls related to counting operations.
TA732-9: The methods needed in a central counting environment to ensure a secure environment SHALL include, but are not limited to, detailed documentation of procedural controls related to reporting data.