Gilbert, S.
, Petersen, L.
and Garris, M.
(2013),
Benefits and Costs of Commissioning: A Case Study Analysis:, , National Institute of Standards and Technology, Gaithersburg, MD, [online], https://doi.org/10.6028/NIST.IR.7964
(Accessed October 31, 2024)